For: multi-site operators and distributors developing a repeat purchasing relationship
The decision: Which commitments make repeat orders more reliable for both parties?
60-second answer: Agree a controlled specification, a usable forecast and clear responsibility for stock, delivery and support. Formalize the relationship when the recurring work justifies it; the number of sites alone is not a useful threshold.
Describe the recurring work
Pull the opening and replacement pipeline, order history, model variations, site exceptions, service demand and delivery performance. Identify what genuinely repeats. A single-site buyer with frequent replacement or service needs may benefit from a structured agreement, while several unrelated projects may have little common scope.
FEX recommends defining a core equipment schedule with approved variations for room size, user needs and operating conditions. Assign an owner to revision control. A standardized list loses value when every project uses a different undocumented version.
| Shared task | Buyer commitment | Distributor commitment |
|---|---|---|
| Forecast | Dated pipeline with funding and readiness status | Capacity and lead-time feedback with stated assumptions |
| Reserved inventory | Agreed release, change and cancellation rules | Identified stock, availability and carrying terms |
| Specification | Approved core and documented exceptions | Matching quote, revision control and substitution approval |
| Delivery and installation | Site evidence and authorized access | Defined scope, crew plan and escalation |
| Aftercare | Asset information and fault reporting | Service route, claim support and agreed reporting |
Price the promises on both sides
Reserved stock consumes space and capital and can become stranded when projects slip. Confirm who owns it, whether reservation is exclusive, what release dates apply and which costs follow a cancellation. Do not describe held stock as a free benefit earned automatically at a certain site count.
Pull actual freight, installation, returns and warranty recovery by project. Agree the measures used in the review: delivery against confirmed dates, service response under the actual agreement, repeat faults and unresolved claims. Explain exclusions instead of presenting a blended average that conceals a difficult region.
Questions for the quarterly conversation
- Which forecast changes caused avoidable cost, and when were they communicated?
- Which variations are justified by site or user needs?
- Which stock commitments no longer match approved projects?
- Who can resolve a cross-project service issue?
- What happens if the primary supplier cannot cover a category or location?
A backup relationship may be useful, but its scope should be explicit. Spreading every order can remove useful predictability; concentrating everything can create supply and support exposure. Decide using capability and cost rather than a universal one-primary-supplier rule.
Keep the partnership review practical: choose an exception, trace its cost and agree a change. A discount schedule is one part of the agreement. Repeated clean execution requires shared records and responsibilities that remain usable when individual contacts change.

Before the next repeat order
- Approve the current core specification and exception process.
- Reconcile the pipeline with reserved stock and installation capacity.
- Agree a short performance review with named escalation and decision owners.