For: dealers, project managers and commercial buyers
The decision: Which proposal delivers the required installed result at a comparable cost?
60-second answer: Normalize the specification and scope before comparing totals. Treat a missing line as unresolved, not free. Separate quoted amounts, estimated additions and commercial risks, then obtain written answers to the gaps.
Define the finished result first
Write the equipment quantities, model revisions, accessories, destination rooms and acceptance requirements into one comparison scope. Send the same scope to each bidder. A delivered pallet, an assembled machine and a commissioned station are different deliverables even when the product names match.
Keep every proposal revision and its validity date. Mark substitutions explicitly, including any change in performance, dimensions, support or accessories. Do not reduce a comparison to one total while leaving the equipment specification inconsistent.
| Line to compare | Normalize to the same scope | Evidence or clarification |
|---|---|---|
| Equipment and accessories | Exact models, revisions, quantities and included accessories | Itemized bill of materials. |
| Freight and accessorials | Destination, delivery window, liftgate and restrictions | Written freight basis and exclusions. |
| Inside delivery | Route, stairs, elevator, staging and room placement | Site survey and responsibility assignment. |
| Assembly and installation | Named tasks, anchoring scope and authorized work | Installation scope and exclusions. |
| Commissioning | Checks, documentation and customer training | Acceptance checklist. |
| Removal | Existing equipment, packaging and waste | Included scope and disposal responsibility. |
| Warranty and support | Components, labor, travel and service route | Full warranty and support commitments. |
| Price and cash terms | Taxes, surcharges, deposits, milestones and expiry | Dated commercial terms. |
Add uncertainty without hiding it in the total
For each missing item, request a supplier price or use a labeled estimate until confirmed. Show the source, assumption and owner of the estimate. A proposed adjustment is not a vendor commitment. Keep unresolved technical or safety conditions out of a falsely precise all-in price.
The comparable installed total is quoted included scope plus necessary excluded scope, using consistent tax treatment and no double counting. Show ongoing costs and financing separately over a stated period. A refundable deposit is a cash-timing issue, not automatically an extra project cost.

Clarify who owns each handoff
- Who verifies the delivery route and site readiness?
- Who supplies approved anchoring, electrical or other specialist work?
- Who authorizes a substitution or change order?
- Who records transport damage and follows the applicable claims process?
- Who signs acceptance and closes outstanding items?
Choose on the result, not only the adjusted total
After the scope is comparable, evaluate documented support, delivery commitments, unresolved conditions and commercial terms. A lower price with a critical unanswered requirement may not be a usable offer. Equally, a higher price needs a specific benefit the buyer values rather than a vague claim of better service.
Keep a final decision note that identifies the selected offer, reasons, accepted exceptions and documents relied on. Do not assume a silence in a quote removes legal rights or creates a contractual obligation; resolve material wording before acceptance.
What to do this week
- Create one common scope for a live project.
- Mark every excluded or silent line in the competing bids.
- Request written clarifications from the responsible parties.
- Compare the revised offers and save the decision record.
Use the warranty matrix for coverage and the installation planning guide for readiness. The worksheet is FEX editorial guidance.