For: Owners, finance leads and general managers who approve requests to add, convert or expand floor space, and dealers whose proposals go into that meeting.
The decision: Whether a request for space and capital goes ahead, goes ahead in stages, or goes back for more evidence.
60-second answer: Require one written request that answers six questions: what problem the space solves and the record that shows it, measured the same way over a period you define; the full installed and operating cost; who will run it; what happens if demand falls; the smallest first stage and the reading that releases the next; and what else has a claim on the same money. If the work alters the building, add landlord consent, permits and accessibility, since federal ADA rules attach path-of-travel obligations to alterations of primary function areas. Approve, stage or return the request against those answers, and book the look-back on the day you approve.
What a space request has to contain
A request for floor space arrives with a signal attached: a queue, a waiting list, a class that sells out, a strong quarter, a competitor’s opening. The signal is an input. A fitness facility investment request should show what that signal means for this building, what serving it costs, and what happens if it fades. Fix the questions in writing and circulate them before anyone drafts a proposal, so evidence is gathered rather than assembled afterward.
- Problem and evidence. What the space is for, and the record that shows the need.
- Source of demand. Existing members shifting their use, or new members the space would attract.
- Full cost. Installed cost, annual operating cost by line, and the building work.
- Readiness. Who supervises, cleans and maintains the space, including during vacations and sickness.
- Downside and staging. What happens if demand falls, and the smallest first stage.
- Competing claims. What else the same money could fund, starting with replacement of existing equipment.
The gate works best with two named roles: the person who signs, and one other person required to write the downside case. Without someone formally responsible for the reversal scenario, the downside section can become a paragraph of reassurance.
Demand evidence: persistence, source and definitions
Persistence. Ask for the same measurement, with the same definition, across several separate periods. You decide how many periods and which ones, using your own check-in history to show where your seasons turn; a reading taken in your busiest month says little about the rest of the year. A metric redefined between periods can manufacture a trend that does not exist. Floor logs and the records that confirm them are covered in logging floor demand signals.
Source. Split the demand between existing members and new members. Existing members moving into a new zone is a capacity or experience case. New members joining for it is a growth case, and it needs evidence from inquiries, trial bookings or a pilot.
Waiting lists. A list counts only if it has names, dates and follow-up. Ask what share of the last list converted when capacity last increased, from your own records. If nobody knows, the list is interest, not demand.
Competitor-driven spikes. A busy period after a nearby site closes or refurbishes may reflect their timetable rather than your market. Date the spike and check whether it outlasts their reopening.
Full cost: equipment, operation and the building
Installed cost. Equipment, freight, installation, site work and the closure window while the work is done.
Operating cost. Staffing hours, cleaning, utilities, service coverage, insurance, consumables and software or license renewals, each line priced and confirmed by the person who will own it. A request that treats the equipment quote as the cost of the space has not been costed.
The building. If the request changes the building, add:
- Landlord consent under the lease’s alteration clause, and any reinstatement obligation at lease end.
- Permits and code path from the local building department, which applies its own adopted codes and amendments.
- Floor capacity for heavy equipment on upper levels, from a structural engineer; see what the engineer needs before an upper-floor install.
- Accessibility. Under the federal ADA title III regulations, an alteration that affects or could affect the usability of or access to an area containing a primary function (“a major activity for which the facility is intended”) must be made so that, to the maximum extent feasible, the path of travel to the altered area, and the restrooms, telephones and drinking fountains serving it, are readily accessible, unless the cost and scope are disproportionate to the overall alteration. The rule deems path-of-travel work disproportionate “when the cost exceeds 20% of the cost of the alteration to the primary function area.” That does not end the duty: the path of travel “shall be made accessible to the extent that it can be made accessible without incurring disproportionate costs,” with priority, in order, to an accessible entrance, an accessible route to the altered area, at least one accessible restroom for each sex or a single unisex restroom, accessible telephones and accessible drinking fountains. The obligation “may not be evaded by performing a series of small alterations” that could have been performed as a single undertaking. Staged projects need particular care: where a primary function area was altered without an accessible path of travel, alterations on the same path of travel undertaken within three years are added together when judging disproportionality. State and local accessibility codes may also apply; the architect and code official confirm what does.
Downside case, staging and competing claims
Write the downside case first. State a specific reversal: demand falls by an amount you choose, or the cohort driving it leaves. Then state the response: whether the equipment can be redeployed elsewhere in the building or the group, whether the lease or finance term can be shortened, and what resale or trade-in value a dated quote supports.
Stage what can be staged. Ask what the smallest version of the proposal looks like, what evidence the first stage will produce, and which reading releases the next tranche, with the person who confirms it named. Release the final stage only once operating cost has been observed rather than forecast. A claim that the benefit only appears at full scale is sometimes true; ask for the reason in writing.
Read it beside replacement. Set the request beside the replacement plan for existing equipment, because deferred replacement is a quiet way of funding expansion. See building a funded replacement reserve.
Under competitive pressure. Competitive pressure changes urgency, not the evidence required. Run the same questions on a shorter timetable and record in the approval that thinner proof was accepted, so the look-back can judge the shortcut.
Request review table
Take this into the approval meeting. The columns are FEX analysis; the measures and triggers are yours.
| Question | Approve when | Stage when | Return when |
|---|---|---|---|
| Problem and evidence | Same measure holds across the periods you set | Evidence is consistent but covers fewer periods than you set | A recent run of busy weeks is the only evidence |
| Source of demand | Existing and new member demand split, with records | New-member demand rests on inquiries or a pilot | “Everyone is asking for it” |
| Operating cost | Every line priced and confirmed by its owner | Some lines estimated, with a date to replace them with actuals | The quote is presented as the cost |
| Building and accessibility | Landlord consent, permit path and accessibility scope priced | Scope known, consent or permit pending | Building questions not asked |
| Readiness | Named supervision and cleaning cover, including absences | Cover named for peak only | “The team will absorb it” |
| Downside case | Reversal scenario with redeployment and exit terms in writing | Scenario written, exit terms not yet confirmed | “Demand is not going to fall” |
| Staging | First stage defined, with the release reading and who confirms it | Stages defined, release reading still vague | “It only works at full scale,” with no reason given |
| Competing claims | Replacement plan funded in the same view | Replacement plan exists but is not costed | “Replacement can wait a year” |
What to do this week
- Circulate the six questions as the required format for every space request.
- Set the measurement periods you will accept for persistence, using your own check-in history.
- For any open request that alters the building, ask the architect or code official about permits and accessibility scope, and check the lease alteration clause.
- Require the downside case and stage triggers in writing before the request reaches the meeting.
- Book the look-back for every approved request on the day it is approved.
Continue with FEX
- Five evidence checks before committing equipment capital
- Setting a hurdle rate across equipment categories
- Checking the lease and building before ordering
- Planning accessible clear floor space and routes
FEX editorial guidance: the six questions, the review table and the staging approach are FEX analysis; the measurement periods and triggers should come from your own records. The accessibility summary is not legal advice; confirm obligations with your architect, the local code official or counsel. The building official and engineer of record decide code and structural questions.
Source notes
- eCFR: 28 CFR 36.403, Alterations: Path of travel (up to date as of October 7, 2026; accessed October 8, 2026) — Primary function definition, path-of-travel requirement, the 20% disproportionality rule, the duty to provide accessible elements up to that limit in priority order, and the series-of-alterations and three-year rules.
Editorial update, October 9, 2026: Removed the fixed three-month persistence threshold and other unsupported rules of thumb, and replaced them with measurement periods the reader sets from their own records. Added building, permit and accessibility checks, verifying the path-of-travel, disproportionality, priority-order and series-of-alterations rules against 28 CFR 36.403, and removed a shared stock photograph and external links that did not support the decision.